Top News
|Mossad and Israeli Special Forces infiltrate Iran for a secret operation Details of the daring ground operation yet unknown | Kuwaiti defence forces mistakenly shoot down three USAF F 15E Strike Eagle aircraft | All Six Pilots Parachute Safely and are in hospitals for Checks | F 15E is a powerful warjet, has two pilots, one to Fly and the other as a Weapons Officer | Iran meanwhile has widened its missile strikes whiie the US Air Force and Navy have intensified Bombing of Iran | US Def Sec Hegseth says There Are No Timelines BUT IRAN WILL NOT HAVE NUCLEAR CAPABILITY | And that ā€˜War Will Not Be Endless’ | Trump asks Iranians to ā€˜Rise up and Take Over Your Government’ | Iran says No Negotiations With US | Trump Confirms Iran’s Supreme Islamic Leader ā€˜evil’ Ali Khamenei killed in targeted missile strikes | Many Iranian military and Islamic leaders also dead | US and Israel launched the biggest ever military strikes in history to decimate Iran’s top leadership | There are no reported of boots on ground | About 200 USAF and Navy jets are hammering Iran’s political and military targets without stop | The missiles are precision | Care is taken to avoid cities and civilians | It’s War | US and Israel attack Iran | Trump says Will Not Allow to Have Nuclear Bomb | Iran Retaliates with Missiles across Gulf and Jordan | But Not Oman | US Bases in UAE, Saudi Arabia, Bahrain, Qatar, Kuwait Hit | Trump asks Iranians to Remove Evil Regime and Take Over | Trump says US Will Annihilate Iranian Navy | Free Exchange of Missiles and Drones | Iranian Foreign Minister Calls For Stopping Attacks and Then Talks | Iran under Internet Blockade | UK PM says Our Planes in Sky for Defensive Operations | Terror Anywhere Threatens Peace Everywhere: PM Narendra Modi while Addressing Israeli Knesset | PM Modi in Israel, Prime Minister Netanyahu receives him with warm hugs | India clears Grand Mother of All Defence Deals Ever - For $ 40 Billion | Dassault Rafales, Airbus Helicopters, Boeing P 8I, Sikorsky MH 60R, Newer Technology Weapons and Drones Cleared | Modi, Macron announce India-France Strategic Partnership And India-France Year of Innovation | India Finally Decides to Buy 114 Rafale Fighters | Big, Bold Decision by Modi Government | Virtual paralysis in MoD Ends, 35 Years After VP Singh’s Lies Over Bofors | Prime Minister Modi Initiates Many Other Reforms on Defence | Congratulations Mr Modi | Nuclear Talks with US a Good Start, says Iran | Oman will continue to Mediate and host the Talks | India’s Agni-3 Nuclear IRBM Test Successful | India, US Trade Pact May be signed in March, says Commerce and Industry Minister Piyush Goyal | US asks Russia and China for a Fresh Nuclear Treaty | India’s Oil Imports from Russia lowest at $2.7 billion in 38 months | RIL buys 2 million barrels of Venezuelan Oil | India fully paid the Committed $120 million to Iran for Chabahar Port development | Project though is uncertain due to US pressure | Police cannot arrest an accused simply to Ask Questions, rules the Supreme Court of India | Adani Defence, Leonardo Aerospace in partnership to make advanced Helicopters in India | Leonardo Aerospace collaborates with Adani Defence to manufacture advanced Helicopters in India | The two companies announced an MoU to set up a ā€˜fully integrated Helicopter Manufacturing Ecosystem in India’ | ā€˜Any Attack Will be an All Out War Against Us,’ says Iran | India votes Against a Human Rights motion Censuring Iran in UN | Indian Woman Preeti Unhale Lives for 25 Years With Donor Heart ♄
SPACE

ISRO Announces Launch Date of its Ambitious Venus Orbiter Mission

The Mission and Space Craft is Called Shukrayaan1 and will Mark India's First Mission to Explore the Inner Planet - VENUS

By R Anil Kumar

Bengaluru: India’s Space Agency, The Indian Space Research Organisation (ISRO), has officially announced the launch date for its highly ambitious project Venus Orbiter Mission (VOM), marking a significant Milestone in India’s quest forĀ  Interplanetary Exploration.

Scheduled to be launched on March 29, 2028, the Mission and the Space Craft named Shukrayaan-1aims to unlock the mysteries of the Earth’s enigmatic twin- Venus.

After its Success of Chandrayaan 3, ISRO has announced the launch date for its Venus Orbiter Mission.

The Mission set for launch on March 29, 2028, will take a total of 112 days to travel to Venus.

The VOM aims to study, Venus’s atmosphere, surface and geological features, using a suite of sophisticated scientific instruments.

About VENUS ORBITER MISSION (SHUKRAYAAN-1)

The VOM will carry 19 Scientific instruments, also called Payloads, and will be launched on-board ISRO’s LVM-3 Rocket for its orbit around Venus.

The Spacecraft will carry an array of cutting-edge instruments, which will help scientists unravel the mysteries of Venus’s thick atmosphere.

This apart, the Mission helps in exploration of its Surface and the planet’s interaction with the Sun.

As per ISRO, a total of 16 Indian Payloads, 2 International Collaborative Payloads and 1 International Payload will be on-board the Shukrayaa-1 Mission.

The Spacecraft will carry an array of cutting-edge instruments, including synthetic aperture radar, infrared and ultra-violet cameras.

VENUS ORBITER MISSION (SHUKRAYAAN-1) – Representational Image

KEY SCIENTIFIC OBJECTIVES OF VOM:

  • These includes examining dust in the Venusian atmosphere, mapping its Surface topography in high resolution, studying the Solar X-ray spectrum near Venus, analysing Venusian airglow and investigating Sub-surface characteristics.
  • Additionally, the Mission will serve as a technology demonstration for ISRO.
  • The technology demonstration include, testing aerobraking and thermal management techniques in the harsh Venusian environment, the Space Agency said.
  • The Mission’s objectives also include investigating the planet’s atmospheric composition, Surface characteristics and potential volcanic or seismic activity.

WHAT WILL VOM BE EQUIPPED WITH:

The VOM will be equipped with a suite of Scientific instruments designed to explore Venusian atmosphere, Surface and plasma environment.

  • VSAR (Venus S-Band Synthetic Aperture Radar)-It aims to search for active Volcanoes and map Venus with high resolution, providing insights into the planet’s topography and surface properties.
  • VSEAM (Venus Surface Emmissivity and Atmospheric Mapper): This hyperspectral spectrometer will study Venus’s Surface and atmosphere, focusing on Volcanic hotspots, cloud structure and water vapour mapping.
  • VTC (Venus Thermal Camera): Designed to map thermal emmissions from Venusian clouds and will provide critical data on atmospheric dynamics and planetary-scale features.
  • VCMC (Venus Cloud Monitoring Camera): This UV and Visible wavelength Camera will capture atmospheric circulation dynamics and study Wave phenomena and lightning,
  • LIVE ( Lightning Instrument for Venus): LIVE will detect electrical activity in Venus’s atmosphere, analysing lightning and plasma emmissions.
  • VASP (Venus Atmospheric Spectropolarimeter): This instrument will investigate cloud properties and global circulation.
  • SPAV (Solar Occultation Photometry): SPAV will measure the vertical distribution of aerosis and haze in Venus’s mesosphere.

Among the 19 Payloads, VIRAL (Venus InfraRed Atmospheric Gases Linker) is the instrument Developed by Russia. The 2 Collaborative Payloads are the Venus Ionospheric and Solar Wind Particle Analyser (VISWAS), which is a Collaboration between ISRO’s Space Physics Lab at VSSC and a Swedish Institute.

Furthermore, the Radio Anatomy of Venus Ionosphere (RAVI) is a Collaboration with Germany.

ABOUT THE LAUNCH:

After it launch on March 29, 2028, the orbiter will take 112 days to reach its destination. According to ISRO, VOM is expected to reach Venus on July 19, 2028.

ISRO says that LVM-3 will place the Spacecraft in an Elliptical parking Orbit (EPO) of 170 KmƗ36,000 Km at 21.5° inclination and an Argument of Perigee (AOP). This will define the path of theĀ  Spacecraft to the final destination of 178°.

After the cruise phase, Venus Orbit Injection (VOI), will be at 500 Km Ɨ 60,000 Km. Aerobraking will be employed for over a period of 6 to 8 months from VOI to achieve the desired low altitude Science Orbit of 200Km Ɨ 600 Km with an inclination of around 90° to carry proposed Science Studies for a period of 5 years, ISRO stated.

The VOM represents a Collaborative Effort with an International participation from Russia, France, Germany and Sweden.

ISRO’s VOM is a testament to India’s Commitment to expanding its Space exploration endeavours and will contribute valuable data to the global Scientific community.

Related Articles

Back to top button